Topic / Technical product leadership
What makes a prototype worth funding?
I start with one person's workflow, decide in advance what evidence would justify more, and keep what happened apart from what I expect to happen.
Two columns, never merged
What happened is not what I expect.
Ascent is shipped and on the App Store, but it has no recorded downloads, revenue or pass rates. ACP makes decisions in code, but it has no customers, pilots or revenue. Each claim below sits in the column its evidence supports.
- Ascent
- Shipped
- Ascent outcomes
- Not recorded
- ACP decisions
- Running in code
- ACP customers
- None
A shipped example
Ascent: one person first
-
First customer
One person studying after work
Ascent started with one user who studies for the CAPM exam after work, tired, on a phone. The app is built on one rule: derive, don't ask. Everything it needs, it works out, readiness included, and it asks only what it cannot derive.
-
What shipped
A native iPhone app
It has 1,122 questions and 36 lessons. It has been on the App Store since July 2026.
-
Packaging
Free to start, one purchase
It is free with three lessons a day in every domain. A one-time CAPM Pass, with no subscription, lifts the daily limit and adds a timed practice exam.
-
Not claimed
No traction numbers
No downloads, revenue, retention or pass rates are recorded, so none are claimed here.
A designed bet
ACP: the plan, with its gates written first
The ACP plan is a planning document. Implementation of the plan, pilots and deployments are on hold. What it shows is how the first workflow, the evidence and the package were chosen before anyone paid.
-
First buyer
An engineering lead with agents in the loop
The first buyer is a lead whose team uses coding agents and CI and still spends time reconciling the ticket, the checked revision and where the change went. The first job is letting agents release routine changes without standing production access.
-
First workflow
One tracker, one CI, one release path
The acceptance case is a Ready ticket and a green, immutable revision, eligible for an isolated staging database migration. Production needs its own decision.
-
Evidence gates
Three facts, kept separate
Authorization, execution and observation are recorded as three separate facts. What the owner reports about use is kept apart from effects someone else observed. No enforcement claim is made before independent review.
-
Packaging
Customers keep their tools and credentials
Teams keep their own tickets, CI, release tools and write credentials. ACP supplies the decision and the record. The plan is an MIT self-hosted release with a hosted option, and the release waits until a third party completes a clean self-hosted setup.
-
Cost
Measured over one window
The plan compares predicted, admitted, observed, duplicate and uncovered builds over the same window, and measures setup time, operator minutes and decision time the same way.
Read next
Essays and work
-
Essay
Building a CAPM Study App
Ascent, and the one rule it is built on: derive, don't ask.
-
Work
Ascent
The app, its screens and how it is built.
-
Essay
A Unified Framework for Product Ideation and Validation
The workflow I use to take a product from idea through validation to a go or no-go decision.
-
Essay
All Assumptions Are Measurable
Testing an assumption about time, cost or staffing against its extremes, average, outliers and failures.
-
Essay
Versatility Is a Design Decision
Why a factory built to make things, not one game product, kept Cursed Crypt alive.
-
Essay
The Last Cheap Question
The questions worth asking while a correction is still cheap.